20,000 ring spindles and two Autocoro open-end machines spin yarn in-house, from 10s open-end to 100s ring-spun — count, twist and strength set by the mill before the first beam is ever warped.
Three Jupiter warping machines build beams from the creel — hundreds of ends wound at even tension, the foundation of every fault-free metre.
Two Jupiter combi ranges size the warp in a single controlled pass, giving each end the strength to survive high-speed insertion.
200 Tsudakoma air-jet looms insert the weft on a jet of air — cam looms for speed, dobby looms for structure, up to six weft colours.
Fabric is singed for a clean face, inspected in-house, and packed for export — one gate, one accountable process.
A new in-house spinning plant takes the mill upstream: 20,000 spindles spinning ring-spun yarns in counts up to 100s, and two fully automated Autocoro machines producing open-end yarns from 10s. The same discipline that runs the looms now sets count, twist and strength — fibre to fabric, inside one gate.